
This includes 2 Foamanizer sections, 6 spacers, 3 long and 3 short Acrylic Rods, 9 large round, 18 Square, and 20 Small Round Tubes. Place the spacers on the 3 long and 3 short rods. Insert them into the marked holes on the bottom layer and slide them down to the top layer. Load the storage tubes.
To assemble, start by placing the spacers onto the 3 long and 3 short rods. Next, insert these rods into the marked holes on the bottom layer, sliding them down until they reach the top layer. Finally, load the storage tubes.




